Site inspection within 48 hours
A project lead walks the building with a moisture meter and camera. Damage is mapped room by room, with readings, measurements and photos tied to each area, so the estimate and the adjuster's scope start from the same record.
- Inspection
- Estimate
- Supplements
- Schedule
- Closeout
Inspection: 2nd floor, units 204–206
Water loss · frozen sprinkler line
Field notes
- Project lead Supply line break located above unit 205 ceiling, sprinkler branch isolated Day 1 · 8:40 AM
- Moisture readings logged at 38 wall points; 14 above 17% in drywall Day 1 · 10:15 AM
- 112 photos filed by room and wall elevation Day 1 · 11:30 AM
- Affected area sketched: 1,840 SF across 3 units and corridor Day 1 · 1:05 PM